Erection and Testing prior to Shipment
The components are erected and all motors, screws etc. run through a test phase.
Low Transport Costs
Each plant component is supplied in a 100% ISO seacontainer, which has been inspected and certified by Germanischer Lloyd. Containerization means: no low loaders, no excess width, no excess weight, lowest container freight rates and fast transport.
No Concrete Foundations
The ground area of the containers ensures stability on compacted soil.
Short Erection and Dismantling Time
The crane required for a short period and the plant ready to operate after one week and can be dismantled within a few days. Therefore the plant may be considered mobile.
Weather Protection
The housing of components within the rigid containers, provide full climatic protection and main- tenance safety.
Environmental Friendly
The LINTEC containerized plant operates concrete operating with low noise and dust emissions. Due to the modular construction with container housing no further cladding is required. For cold areas containerized environments friendly heating systems can be offered as optional equipment.
Plant Building Concept
Integrated staircases and working platforms on each container floor enable an easy access to all plant components which simplifies the maintenance of the plant. The standard plant looks like a modern factory building, not as a conventional Concrete Mixing Plant.
Plant components can be easily changed due to the containerized construction.
Plant Security
The plant tower can only be accessed via one main lockable security door thus preventing unauthorized access to the plant, theft and vandalism.